Warsaw W. Center St., Indiana American Water

Project Description

Client:   American Water
Location:   Warsaw, Indiana
Year Completed:   Spring 2019

Indiana American Water (INAW) is one of the largest private water utilities in America. Selge was hired by them to perform new construction and maintenance for their infrastructure in Indiana. For this project, work included directionally drilling 2,230 feet of 8” HDPE water main along Center Street in Warsaw, IN. Once the water main was installed, we then proceeded to install 46 new water services along Center St to supply the residents with fresh, clean water.

  • 565 Linear Feet of Ductile Iron Water Main
  • 2,230 Linear Feet HDPE Water Main Directionally Drilled
  • 8 – Gate Valves
  • 3 – Fire Hydrant Assemblies
  • 326 Linear Feet of Asphalt road Replacement
  • 23 – Meter Pit with Lid

More Projects by Selge Construction

  • Capital Avenue Extension Mishawaka, IN
  • Fed Ex Excavating & Earthmoving
  • The Foundry - Elkhart, IN
  • Lincoln Way West & Charles Martin Redevelopment
  • Hidden Hills Estates
  • LaGrange County Regional Utility District

Plymouth Candy Storm Sewer Improvements

Project Description

Client:  City of Plymouth
Location:   Plymouth, Indiana
Year Completed:   2019

Work included sanitary and storm sewer piping & manhole replacements. Storm sewer work included INDOT end sections at retention pond to remedy flooding of neighborhood homes. Work finished with asphalt paving and driveway replacements.

  • 204 Linear Feet Sanitary Sewer
  • 2,2276 Linear Feet of Storm Sewer
  • 3,800 Linear Feet of Bituminous Base
  • 9 – 72” Diameter Storm Manholes
  • 4 – Driveway replacements

More Projects by Selge Construction

  • Capital Avenue Extension Mishawaka, IN
  • Fed Ex Excavating & Earthmoving
  • The Foundry - Elkhart, IN
  • Lincoln Way West & Charles Martin Redevelopment
  • Hidden Hills Estates
  • LaGrange County Regional Utility District

LaGrange County Regional Utility District

Project Description

Client:  LaGrange County Regional Utility District Region C
Location:  Howe, Indiana
Year Completed:   2020

Selge Construction was the successful bidder for the LaGrange County Regional Utility District’s Contract A Wasterwater Treatment Plant for Wastewater Service to the unincorporated communities of Howe, Cedar Lake, CT 700, and ITRCC TP 7. The project involves the construction of a new extended aeration activated sludge wastewater treatment plant. The wastewater treatment process will include a plant lift station, a mechanical screen with washer/compactor, ultra violet disinfection, post-aeration and effluent flow monitoring. The facility will include a lab/maintenance building and an electric/headworks building.

  • 14 – 48” Sanitary Manholes
  • 1160 Linear Feet of HDPE Forcemain pipe
  • 717 Linear Feet of Ductile Iron pipe
  • Building construction, electric, and hydrants

More Projects by Selge Construction

  • Capital Avenue Extension Mishawaka, IN
  • Fed Ex Excavating & Earthmoving
  • The Foundry - Elkhart, IN
  • Lincoln Way West & Charles Martin Redevelopment
  • Hidden Hills Estates
  • LaGrange County Regional Utility District

Elkhart Jackson Blvd Reconstruction

Project Description

Client:   City of Elkhart
Location:   Elkhart, IN
Year Completed:   2019

The project included the complete reconstruction of Jackson Blvd, between the Elkhart River and Johnson Street. Also, Elkhart Ave between Jackson Blvd and the Elkhart River. The project included new roadway, sidewalk, bike path, sanitary & storm sewer, water main, street lights, and traffic signals.

  • 3841 Linear Feet of Water Main
  • 1144 Linear Feet of Sanitary Sewer
  • 2823 Linear Feet of Storm Sewer
  • 72,238 Square Feet of Concrete
  • 44,626 Square Yards of Asphalt
  • Street Lights and Traffic Signals
  • 28 Benches, 28 Bicycle Racks, and 48 Trees

More Projects by Selge Construction

  • Capital Avenue Extension Mishawaka, IN
  • Fed Ex Excavating & Earthmoving
  • The Foundry - Elkhart, IN
  • Lincoln Way West & Charles Martin Redevelopment
  • Hidden Hills Estates
  • LaGrange County Regional Utility District

Lincoln Way West & Charles Martin Redevelopment

Project Description

Client:   Local
Location:  Lincoln Way West and Charles Martin Redevelopment
Year Completed:   2018

Selge performed the total reconstruction of the Lincoln Way West, Charles Martin, and Leland intersection. The main goal of the project was to improve the traffic flow and develop the surrounding area in a way that would promote better business and residential flow. Selge installed:

  • (1000’) 12” Sanitary Sewer PVC Pipe
  • (20) Sanitary Sewer Manholes
  • New Bike racks
  • New fire hydrants
  • All new asphalt roads and concrete sidewalks
  • All new street lighting and landscaping
  • Brick paving

More Projects by Selge Construction

  • Capital Avenue Extension Mishawaka, IN
  • Fed Ex Excavating & Earthmoving
  • The Foundry - Elkhart, IN
  • Lincoln Way West & Charles Martin Redevelopment
  • Hidden Hills Estates
  • LaGrange County Regional Utility District

Box Culvert – New Buffalo, MI

Project Description

Client: Berrien County Drain Commissioner
Location: New Buffalo, MI
Year Completed: 2017

Remediation of the Lighthouse Creek Drain from downtown New Buffalo to Lake Michigan. The job included widening of the drain, drudging, new stone walls along the edges, and a 5’ X 16’ concrete box culvert.. A few of the specs included:

  • 600 ton of Heavy Rip Rap Protection
  • 2000 ton 60-80” Boulder walls
  • 78 LF of 5’ X 16’ RCP Box Culvert
  • 54 LF 10” SDR Sanitary Sewer Main
  • 400 SY Sidewalk Replacement

More Underground Utility Projects by Selge Construction

  • Foundation Drive Utilities & Drainage Improvements
  • University Drive - Granger, IN
  • Box Culvert - New Buffalo, MI
  • Lincoln Way West & Charles Martin Redevelopment
  • Elkhart Jackson Blvd Reconstruction
  • LaGrange County Regional Utility District
  • Plymouth Candy Storm Sewer Improvements
  • Warsaw W. Center St., Indiana American Water

University Drive – Granger, IN

Project Description

Client: City of Mishawaka Board of Public Works
Location: Lakeland, IN
Year Completed: 2016

Installation of sanitary force main installed by horizontal drilling methods. Modified surface and lift stations. This project included the following specs:

  • 5400 LF of 12” HDPE sanitary force main
  • Horizontal drilling of HDPE
  • Modify asphalt surface
  • Upgrade lift stations

More Underground Utility Projects by Selge Construction

  • Foundation Drive Utilities & Drainage Improvements
  • University Drive - Granger, IN
  • Box Culvert - New Buffalo, MI
  • Lincoln Way West & Charles Martin Redevelopment
  • Elkhart Jackson Blvd Reconstruction
  • LaGrange County Regional Utility District
  • Plymouth Candy Storm Sewer Improvements
  • Warsaw W. Center St., Indiana American Water

Foundation Drive Utilities & Drainage Improvements

Project Description

Client: Saratore Company Incorporated
Location: Buchanan, MI
Year Completed: 2016

Excavation of basin, building pad, topsoil strip for embankment areas, excavation of building pad drive & parking, excavation of road, berm & swale, installed gravel base, compact aggregate, and #23A gravel for approaches. Installed sewer, water main, concrete curb, gutter, and driveway. A few of the specs included:

  • Excavation ~40,000 cubic yards
  • Berm & swale 625 linear feet
  • 2,837 ton #22A gravel base
  • 735 ton #23A compact aggregate
  • 210 ton #23A gravel for approaches
  • 4,570 linear feet sewer pipe
  • 3,650 linear feet concrete curb, gutter, and driveway
  • 2,082 linear feet water main
  • 2,865 cubic yards topsoil and subgrade treatment.

More Underground Utility Projects by Selge Construction

  • Foundation Drive Utilities & Drainage Improvements
  • University Drive - Granger, IN
  • Box Culvert - New Buffalo, MI
  • Lincoln Way West & Charles Martin Redevelopment
  • Elkhart Jackson Blvd Reconstruction
  • LaGrange County Regional Utility District
  • Plymouth Candy Storm Sewer Improvements
  • Warsaw W. Center St., Indiana American Water