Project Description

Client: Berrien County Drain Commissioner
Location: New Buffalo, MI
Year Completed: 2017

Remediation of the Lighthouse Creek Drain from downtown New Buffalo to Lake Michigan. The job included widening of the drain, drudging, new stone walls along the edges, and a 5’ X 16’ concrete box culvert.. A few of the specs included:

  • 600 ton of Heavy Rip Rap Protection
  • 2000 ton 60-80” Boulder walls
  • 78 LF of 5’ X 16’ RCP Box Culvert
  • 54 LF 10” SDR Sanitary Sewer Main
  • 400 SY Sidewalk Replacement