Project Description

Client: INDOT
Location:   Mishawaka, IN
Year Completed:   2011

Work entailed clearing right-of-way, pavement removal, common excavation, concrete curb and curb and gutter, installed pipe, geotextiles for underdrains, inlets, manholes, catch basins and all other appurtenance associated with the project. Details include:

  • 24,736 SY of pavement removal
  • 168,525 CY common excavation
  • 43,044 concrete curb and curb and gutter
  • 69,519 LF of pipe, type 1-3, circular, 6” – 42”
  • 44,364 SY of geotextiles for underdrains, inlets, manholes, catch basins